Lake Shore Live Steamers > Images


Work Session


What do you do at the work session when it rains? We walked the track to check on possible problems as informed by the engineers for future work sessions. The foggy mist just permeated the woods today from the rain.
Back at our new storage facility Dave Foster was spraying on a concrete floor sealer before we tracked it all up with dirt and mud. He didn't spray it that heavy, the rain had been blowing against and under the roll-up door.
Dave at the far end of the building from where he started. Almost done with the first coat as two coats are recommended and the floor won't get the second coat till this Saturday.
Dave holds the sprayer tank as Lew Fowler puts more of the floor sealer in to finish the corner behind Dave. The weather being what it was ended the work session and by early afternoon we were all on our way home as it continued to rain.
                                               
This site is copyright 2000-2018