Lake Shore Live Steamers > Images


Work Session - 3/02/11


Dick Clark resorting to the instant glue to hold down the roofing material as the Pliobond didn't work. Disconnecting some of the hydraulic pump hoses on the Park engine for the suction line to the pump.
Dick and Rick Nagy takng a break and Dick still hadn't glued his fingers together yet. Dick continues to work on the roof edging with the instant glue.
Bill Deptowicz taking measurements for the gas tank support to clear the existing control rods. Bill laying out the holes in the bracket for the gas tank mount.
Bill drilling the holes in the quarter inch steel plate that will be the gas tank mounting bracket. There's the gas tank bracket tentatively bolted in place.
Bill tightening up the bracket through the bed plate of the engine. Steve Zaken's box car cover is taking shape with the door detail added, ready for paint.
Dave Foster watches as Bill drills the holes for mounting the hydraulic oil tank. We've got a distribution block that we are removing from in front of the gas tank and Dave is going to make up a splice block to replace it.
                                               
This site is copyright 2000-2018