Lake Shore Live Steamers > Images


Work Session - 4/23/14


It was a cold and damp day for the work session so Ted Nyland and John Koontz worked in the switch shed building a switch. Ted has been working with John showing him how he builds the switches as Ted has been our main personnel for switch building.
Out behind our Stanek storage barn the daffodils are close to full bloom that Marie Nyland had planted to dress up the area by our grade wall at the end of the yard. See, it just needs a woman's touch.
Dave Hird had cleaned out some of the switch throws up by the station from their accumulated debris acquired over the winter months. Here Dave clears out any stones or twigs between the guard rails after he lubes the switch throw linkage.
                                               
This site is copyright 2000-2018