Lake Shore Live Steamers > Images


5.26.04 Work Session


Our Trackmaster checking the alignment of track #2 at High Creek. Dick's not really laying down on the job.
Lookie!, Lookie!, George is wielding a pick. Edith will take all the help she can get.
Extending the track from the new switch on Dirt Siding. Dick knew exactly where to place the switch. How else would we have rock interference?
Dave F., George D., Dick C. and yours truly Bill D. muscled the stone out of the ground. The rock is off to the side and the track connected to the switch
Eventually we'll tie into the mainline at Ridgeway, just before Big Bend Bridge
Foundation excavation for new transfer table at steaming bays has been started and Karl is "shooting" the elevations. Rex and Ray doing repairs to a switch.
                                               
This site is copyright 2000-2018