7.07.04 Work Session


Dick Clark and George Davidson discussing the progress of the station expansion and the shorter overhang
End views of the station expansion looking East
Header beam is too low and overhang is too short - will have to be reworked. Dick and George discussing location of new switch.
We decided it was easier just to remove track and ties as a sectional piece for reuse. At right, view looking east over Festival Bridge
George Davidson and Dave Foster talkin gear boxes for George's engine with new switch in foreground. Right, Ballast removed, switch in place and Dick Clark starting to replace ties.
(Above)Switch tied into mainline with pieces of new steel rail and ready for ballasting
(Above)Ballasting is done and we have to pick up the tools. The rail bender that we use is in the foreground on a flatcar
(Above)The box on the vertical pipe is the control box for automated switch, behind Dave seated in picture #12, for turnout into "Orchard Loop". Box was designed by Ron Trenhaile
                                               